Scope of Work: Design and construction of 120 housing units (2- & 3-bedroom) Internal road network with drainage system Water supply and electrical infrastructure Landscaping and estate security features
The FHA aimed to deliver a modern yet affordable estate within a congested urban environment, with strict timelines and limited access to utilities during the early phases.
Design and build 120 affordable housing units with full infrastructure—roads, drainage, and electrical systems—within 12 months, using sustainable materials and cost-efficient methods.
Delivered all units 2 months ahead of schedule.
Integrated solar street lights and rainwater harvesting systems.
Achieved 15% cost savings via local sourcing and prefabricated components.
Zero on-site injuries and full regulatory compliance.